Thursday, April 11, 2013

Red flag

Over the past two weeks I added putting a shelf on my tv mount so I spent a lot of time figuring out how I was going to add that into my project. I spent the required 8 hours on my project. Hands on I did I 3-D drawing of the new tv mount and did a new metal list with the shelf added. I had a mentor meeting. We talked about what I was doing with the shelf addition to my project. I journaled twice this week about the new 3-D drawing on my project and a description of what was going on in the drawing. I was in class this week and I did not have to use my journal. I think my work this week was pretty good because now that I have everything squared away with what the final project is going to look like I should be able to make it pretty quick. My plan for the next week is to at least have the piece that will be screwed into the wall cut out with the holes cut out.

No comments:

Post a Comment