Thursday, April 11, 2013

Out of the Rut

PLANNING
7 things that I want to accomplish in the next week. I would like to get the part of my tv mount that will be screwed into the wall cut out. And then u want to have it shaped to how I want it. Then I have to draw and measure two spots on it that are perfectly in line with each other, be centered on the plate and, be far enough apart that I can weld the connection piece onto it without making it so I can't screw the screws into it. Than I need to drill the holes the size I need for the screws.
Supplies I need to get. I need to get the metal that is needed to make the part that goes on the wall. And I will need a lot of tools such as a drill a plasma and a soapstone. 3 things I should talk to my mentor about are what my plan is for the week in making this part my day to day plan in making it. 7 things I will need to more about. I will need to learn how to find studs in a wall that is not sheet rock I know how to find studs in walls that are Sheetrock but I do not know how I. Walls that are not and where I am hanging the tv mount it is not sheet rock.

No comments:

Post a Comment