Wednesday, May 29, 2013

Welding

Everything has been cut out and I have started to weld everything together. I should be done completely either today or tomorrow with my project. I am using a pulse mig bead on all of my weld joints because I think that it looks the best. A pulse bead is when you do not have a constant weld it is a bunch of small welds on top if each other that overlap and make a weld. I think that this type of welding looks the best.





Tuesday, May 28, 2013

In class jurnal

I would like to borrow the way he did his power point. He put pictures up and not much words on his slides and then explained what was happening in the pictures and I would like to do that.
A particular strength of the presentation what the playing he did when he was explaining ways of playing on the slides to really give us the feel of what he was trying to describe
I won't have anything to play so I will need to find a different way to get the evaluators involved in what I am examining.

Thursday, May 23, 2013

Today I finished up drilling out the slits on the piece that will be screwed into to back of the tv. I used a drill bit to file out the metal that wasn't over on the inside of the three holes.

Friday, May 17, 2013

Today I started making the piece that will be put on the back of the tv. I measured the screw holes in the back of the tv and it was a 4" by 4" square. I used the same process as the piece that will be put on the wall. I plasma cut a 4 1/2" by 4 1/2" square and then blended the side smooth. Then I drilled four holes in a 4" by 4" square. I took the piece home last night and the holes did not line up perfectly. The top ones did but the bottom ones were A little bit low so today I started to make the bottom two adjustable so that it will fit no matter what. The holes I drilled were 5/16" holes so I made a 5/16" slit that was 1/2 long on both sides. I am not Sony with this I drilled three holes and now I need to get the remaining material out of the slots tomorrow and hopefully when I take it home it will line up and I will be able to screw it into the tv.



Thursday, May 16, 2013

Drilling

Today I got the holes laid out and got them drilled I measured so that the holes would be centered and an inch and a half from the top and bottom and then drilled the hole





Red flag

Over the past week I have gotten a lot of work done in my project I got the piece that will be screwed into the wall cut out cleaned up and drilled the holes in it. I have spent about 8 hours working on my hands on. I had three journal entries on the process of making and cutting that put. For the next week I plan to compete the tv mount and get it ready to personalize it with things that I want to add. The project is moving along we'll and I should be done even before I had planned. This will give me a lot of time to customize it and paint it well so it looks really good when I am complete. I have had a mentor meeting and we talked about how the project is coming along nice and what work I got done this week.

Monday, May 13, 2013

Cutting and blending

Saturday I cut what I drew op and it came out really nice. I cut it with a hand plasma so the cuts were not perfectly strait so once I was don't I had to take a variable speed grinder and a blending disk and blend the cut marks down til they were smooth. After that I used the blending disk again to make is finger friendly and got all the sharp edges off and rounded them. Tonight I need to go and pick up two skews that are big enough to hold the whole tv mount up but not too big so it will split the stud in the wall and ruin it. After I get the size screws I need I will k ow how big of holes I need to drill in and be Able to lay all of that out and drill it tomorrow.